In April 2015 Holystone Civil Engineering entered a contract with Biffa Waste Services to infill inert waste into their Houghton le Spring landfill, With a void space of approximately 750'000 m3 the contract is set to run for a minimum of four years to bring the site to the required ground level. 


In addition to the inert waste disposal offered on site there will also be a selection of recycled aggregates for sale from the crushing and screening operation performed on site which will prolong the length of the contract while also benefiting the environment through our ethical recycling policies sourcing reusable materials for our civils sites without having to travel distance to acquire them.. 

Houghton Le spring 

Inert waste landfill site